Back to the journal
№ 001InfrastructureOctober 2026

Why Hyderabad is becoming India’s data centre corridor.

Hyperscalers are not choosing Hyderabad for its coastline. They are choosing it for stable ground, room to build and a state that wants them. Whether the corridor lasts will depend on power, water and how well it is built.

Prana Engineering Studio10 min read
A concrete brutalist facade seen from below.

From the city that wrote the software to the city that runs it

For two decades, Hyderabad’s reputation was built in office towers. HITEC City and the Financial District filled with engineers writing software for the rest of the world. The servers that software ran on mostly lived somewhere else.

That is changing quickly. Hyderabad’s live data centre capacity grew from 60.9 MW in 2022 to 151.4 MW at the end of 2025, and about 1.9 GW more is under construction, committed or planned. Only Mumbai has a larger pipeline in India, according to Knight Frank’s India Data Centre Market Update 2025. In 2026 alone, Microsoft opened its largest Indian cloud region in the city, AWS broke ground on a new facility, and TCS announced a 1 GW AI campus.

For anyone who builds mission-critical infrastructure, this matters. A corridor of this size will need hundreds of buildings engineered to tolerances most of the Indian construction industry has never been asked to meet. This essay looks at why Hyderabad is winning these projects, how it compares with India’s other hubs, and what the corridor will demand of the people who build it.

We write as an engineering practice headquartered in Jubilee Hills, a few kilometres from where much of this is happening.

Who is building in Hyderabad

The corridor is being driven by global hyperscalers, a large Indian IT company moving into infrastructure, and colocation operators such as NTT and AdaniConneX, which Knight Frank notes are scaling up in the city.

CompanyWhat is being builtScaleWhen
MicrosoftIndia South Central cloud region, three availability zones; its largest hyperscale region in IndiaFirst delivery against a US$17.5 billion India commitment for 2026–2029Generally available 6 August 2026
AWSNew data centre expanding its Asia Pacific (Hyderabad) RegionOver US$1.3 billion invested in the region by end-2025; part of a US$21 billion-plus India plan for 2026–2030Ground broken 15 July 2026
TCS (HyperVault)1 GW AI data centre campus on 264 acres at Bharat Future City, with liquid cooling and GPU hallsUp to ₹70,000 crore, built in phasesAnnounced 2026
Government of TelanganaA dedicated data centre city at Aloor, Chevella mandal, about 55 km from Hyderabad1,500 acresDetailed report ordered June 2026
Announced and under-construction capacity in and around Hyderabad

These investment figures cover different periods and geographies, so they should not be added together as a Telangana total.

The state’s own ambition is larger still. At Microsoft’s region inauguration in September 2026, IT Minister D. Sridhar Babu said Telangana has more than 300 MW operational and 2 GW under development, and is targeting 5 GW of hyperscale capacity and about US$30 billion of investment by 2029, as reported by Telangana Today. The state’s figure is statewide and counted differently from Knight Frank’s Hyderabad IT-load figure, which is why the two numbers differ.

Why Hyderabad: five reasons operators give

1. Stable ground, away from the coast

Hyderabad sits on the Deccan Plateau in seismic Zone II, the lowest-risk zone under IS 1893 (2016). That code remains in force after the Bureau of Indian Standards withdrew its 2025 revision in March 2026. Being inland also keeps it away from coastal cyclone and flood risk. Knight Frank describes this “disaster-safe geography” as one of the city’s main advantages over more expensive coastal hubs. For a building expected to run without interruption for twenty years, the ground it stands on is the first redundancy.

2. Room to build at campus scale

Modern AI data centres are not single buildings. They are campuses of several halls, substations and cooling plant, often hundreds of acres. Hyderabad’s outskirts still offer that land. The TCS campus alone takes 264 acres, and the state’s planned data centre city takes 1,500. Mumbai’s operators compete for far scarcer and costlier land.

3. A state that wants the business

S&P Global’s Data Center Policy Attractiveness India index, published in October 2026, ranks Telangana’s policy package the most attractive in the country, citing its electricity and regulatory incentives. The state’s data centre policy offers dual-grid power, renewable energy access and electricity at generation cost for eligible projects, along with incentives aimed at high-density GPU halls and liquid cooling.

4. Hyperscalers already here

AWS and Microsoft both run multi-zone cloud regions in the city. Once one hyperscaler builds, suppliers, network carriers, colocation operators and enterprise customers follow, and each new project becomes easier to justify than the last.

5. People who understand the workload

Hyderabad’s IT workforce knows the AI workloads these buildings will host, and the pipeline of people who can operate the facilities is being built deliberately. AWS’s data centre skilling programme in Telangana has trained 250 students, 110 of whom joined its operations team.

How Hyderabad compares with India’s other hubs

Mumbai remains India’s data centre capital by a wide margin. Hyderabad’s case is not about today’s capacity. It is about where the next wave is going.

Hyderabad is fifth in live data centre capacity, but second in pipeline

Live IT capacity by city, MW, end of 2025

Mumbai766.6
Chennai191.5
Delhi-NCR174.5
Bengaluru169.5
Hyderabad151.4

Pipeline about 1.9 GW, second only to Mumbai.

Pune145.3
Kolkata23.1
Source: Knight Frank, India Data Centre Market Update 2025.

Hyderabad’s live capacity is fifth among Indian cities, but its pipeline is second only to Mumbai’s. That gap between today and tomorrow is why so much construction is about to happen there.

CityMain strengthMain constraint
MumbaiSubsea cable landings, financial-sector demand, the deepest marketScarce, expensive land; coastal flood and cyclone exposure
ChennaiSubsea cable landings and a large early-stage pipelineCoastal cyclone and flood exposure
Delhi-NCRGovernment and enterprise demand in the capital regionExtreme summer heat raises cooling loads
BengaluruClosest to India’s largest base of technology customersLand costs and water stress
HyderabadInland Zone II ground, land for campuses, the top-ranked state policyNo cable landing of its own; growing pressure on power and water
Strengths and constraints by hub

Hyderabad’s real weakness is distance from the sea. International traffic still lands in Mumbai and Chennai, so the most latency-sensitive workloads tend to stay there. Hyderabad suits cloud regions, disaster recovery and AI training, where power and space matter more than milliseconds. HDFC Bank, for example, is one of the first customers using Microsoft’s Hyderabad region for disaster recovery.

What the corridor will demand of its buildings

The advantages that brought operators to Hyderabad are real. The constraints are just as real, and most of them land on the building.

Power is the first constraint

Telangana hit an all-time peak power demand of 19,543 MW in September 2026, up 23% on the same day a year earlier, and peak demand within Greater Hyderabad is expected to pass 5,000 MW next summer. The Union power ministry told Parliament in July 2026 that AI data centres could add 26.3 GW of national demand by 2031–32, as set out in this account of the power and water test. Every gigawatt campus therefore arrives with its own substations, dual grid feeds, backup generation and redundant distribution. A building that cannot keep its power path alive during a grid fault has failed at its main job.

Water decides the cooling strategy

Cooling uses an estimated 40% of a data centre’s electricity, and conventional evaporative cooling uses large volumes of water. Hyderabad faces a projected domestic and industrial water shortfall of 240 million gallons a day by 2027–28. That makes water-light cooling a design requirement, not a preference: closed-loop and direct liquid cooling, dry coolers, treated wastewater instead of fresh water, and metered water use. Microsoft says its Hyderabad region uses zero water for cooling, and the TCS campus is designed around liquid cooling.

AI density changes the structure

GPU halls concentrate far more power, heat and weight per rack than the server rooms of a decade ago. Liquid-cooled racks, coolant distribution units and pipework add floor loads and need routes coordinated with power and structure from the first drawing. Zone II ground lowers seismic risk, but it does not remove the need to anchor heavy equipment and design to code.

Speed must not outrun discipline

Campuses of this size are built in phases, often while earlier halls are already live. That calls for modular and pre-engineered construction, careful sequencing around live operations, and full integrated systems testing before every handover. The pressure to deliver capacity quickly is the same pressure that, in any mission-critical building, tempts contractors to skip a test or substitute a component. As we argued in our essay on honest construction, a building whose failure falls on others has to be verified, not trusted.

“If the corridor handles power and water well, Hyderabad’s advantages will compound. If it does not, they will become its limits.”

Where Prana stands

We are a Hyderabad engineering practice, and the corridor is being built on our doorstep. To be clear about our position: we do not build hyperscale data centres today. We are preparing deliberately to be one of the Indian teams trusted to build the facilities around them, and in time the halls themselves.

Our engineering studio has developed a reference design for a 5 MW modular mission-critical hall. It covers high-density thermal envelopes, N+1 electrical topologies and modular pre-cast structure, and was validated in simulation before any material was cut. On our industrial projects we already coordinate structure, MEP and airflow in a single model, mount precision equipment on vibration-isolated foundations, and have every project independently inspected.

The corridor will also need substations, utility buildings, staff facilities, warehouses and supplier plants, all built to the same standard of reliability. That is where disciplined regional builders can contribute now.

Frequently asked questions

How much data centre capacity does Hyderabad have?
Knight Frank puts Hyderabad’s live IT capacity at 151.4 MW at the end of 2025, up from 60.9 MW in 2022. About 1.9 GW more is under construction, committed or in early planning, the second-largest pipeline in India after Mumbai. The Telangana government counts more than 300 MW operational statewide.
Which companies have data centres in Hyderabad?
AWS runs its Asia Pacific (Hyderabad) Region and broke ground on a new facility in July 2026. Microsoft opened its India South Central cloud region there in August 2026. TCS is building a 1 GW AI campus at Bharat Future City, and colocation operators including NTT and AdaniConneX are expanding in the city.
Why are data centres choosing Hyderabad?
Hyderabad is inland and in seismic Zone II, the lowest-risk zone, which protects it from earthquake, cyclone and coastal flood exposure. It also has land for large campuses, a state data centre policy rated the most attractive in India by S&P Global, and an established hyperscale and IT ecosystem.
What is Telangana’s data centre target?
Telangana’s IT minister has said the state is targeting 5 GW of hyperscale data centre capacity and about US$30 billion of investment by 2029. The state is also planning a 1,500-acre data centre city at Aloor in Chevella mandal, about 55 km from Hyderabad.
What are the risks for Hyderabad’s data centre growth?
The main risks are power and water. Telangana’s peak power demand is rising fast, and Hyderabad faces a projected water shortfall by 2027–28. New data centres will need water-light cooling, dedicated grid infrastructure and renewable power procurement.
Does Hyderabad have subsea cable connectivity?
No. Hyderabad is inland, so international traffic reaches it over terrestrial fibre from cable landing stations in Mumbai and Chennai. That makes it better suited to cloud regions, disaster recovery and AI training than to the most latency-sensitive workloads.
Sources
Chapter 08 · Contact

Let’s build something important.

Tell us about the project you have in mind. We reply personally within two working days, usually with a set of questions before a proposal.

By sending you agree we can reply to you by email. We do not share your note with anyone else.