N° 01Residential · Tirupati

A quiet residence engineered against the monsoon.

Tirupati sits at the meeting point of coastal humidity and a punishing summer sun, a climate where the small details in an envelope decide whether a residential building ages beautifully or ages badly. Our client wanted a mid-density block that would still feel calm, cool and dignified fifteen years after handover. That, more than anything, framed the entire design.

A quiet residence engineered against the monsoon.
Client
Confidential
Location
Tirupati, Andhra Pradesh
Year
2023 to 2024
Program
Residential · 24 apartments
Size
62,000 sq. ft. GFA
Status
Completed · Occupied
Team
Prana Engineering Studio
Challenge

Design a mid-density residential block for a Tirupati micro-climate where humidity, monsoon load and long service life would normally force compromise on finish quality.

Engineering approach

The project began with a shared 3D model instead of a set of drawings. Structure, MEP and façade were resolved as one continuous system, coordinated with clash detection every week. Every core drawing was signed off in BIM before a single mould reached site.

On the material side, we developed a bespoke concrete mix with slag cement and a mid-range plasticiser, targeting slow, controlled curing to minimise micro-cracking during Tirupati’s dry season. Every pour was instrumented with embedded temperature sensors.

The rainscreen façade was wind-tunnel tested against 130 kmph design gusts. Fixings were selected for a 30-year service life without repainting. Third-party envelope inspection was written into the contract from day one, not as a defect check, but as a design partner.

  • 01Post-tensioned RCC slabs, 200 mm typical
  • 02BIM Level 400 coordination · structure, MEP, envelope
  • 03Bespoke slow-cure concrete mix, sensor-instrumented pours
  • 04Wind-tested rainscreen façade at 130 kmph design gusts
  • 05Independent envelope inspection embedded in the contract
Outcome

The building was handed over three weeks ahead of programme. Post-tensioning reduced RCC steel by 19% against the original conventional-frame benchmark. Independent audit at 24 months found zero envelope defects, and the client’s facility team reported a 30% drop in first-year maintenance calls versus their previous developments.

19%
reduction in RCC steel via post-tensioning
0
envelope defects at 24-month audit
3 weeks
delivered ahead of the contract programme
Selected views
Chapter 08 · Contact

Let’s build something important.

Tell us about the project you have in mind. We reply personally within two working days, usually with a set of questions before a proposal.

By sending you agree we can reply to you by email. We do not share your note with anyone else.